Whistler Museum and Archives Society Ski-Town Stories The History of Whistler’s Lifts

The History of Whistler’s Lifts

8 Comments

Article by Diana Caputo for Whistler Museum

We all remember when Whistler Blackcomb announced that they would exchange the 25 year old Village gondolas with new and bigger ones in the fall of 2014. The old cabins found new owners all over the world. But do you know the history of all the  lifts at Whistler Blackcomb? Slide on and take a gondola ride through the ages.

The original Red Chair in the 1970s, Whistler Museum, Whistler Mountain collection
The original Red Chair brought skiers up to the Roundhouse from 1965 to 1992, Whistler Museum, Whistler Mountain collection, 1970s.

The first lifts were built on the south side of Whistler Mountain (what is now known as Creekside). By fall 1965, several lifts were installed, including a four person gondola, a double chair lift, and two T-bars.

With the opening of Blackcomb in 1980, a long-lasting rivalry started between both independently owned mountains. This led to a race to build lifts with the motto “higher, faster, and safer” in mind.

Whistler was large, highly departmentalized, more Canadian and European as well as more traditional. New to the business of skiing, the Vancouver based Hastings West Group took over  Garibaldi Lifts Limited. In contrast, Blackcomb was young, tight, US-dominated and half controlled by the Aspen Corporation, whom were already experienced in the ski business. Blackcomb ski runs were designed to follow the fall line whereas Whistlers runs were designed more so to side-run the mountain.

Original pin that was used to promote the new Wizard Chair at Blackcomb Mountain in 1985, Whistler Museum.
Original pin that was used to promote the new Wizard Chair at Blackcomb Mountain in 1987, Whistler Museum.

In the following years, a marketing battle between both mountains was up and running. When Blackcomb installed its alpine 7th Heaven T-Bar in 1985 it became North Americas only “Mile High Mountain”. The new area opened up, including four powder bowls, wide open glacier skiing, and it also provided visitors with a vertical mile (1,609 meters’/5,280 feet) of skiing. A year later, Whistler Mountain responded with a high alpine triple Chair lift called Peak Chair, opening Whistler’s highest peak (1,530 meters’ (5,020 feet). The new alpine area provided experts with some of the most challenging runs in the world. In 1996, Whistler became the only resort in history to be simultaneously named No. 1 by Snow Country, SKI and Skiing magazines. However, even more exciting was the news announced March 1997 when Whistler and Blackcomb Mountain merged to form one big mountain company, which is today well known as Whistler-Blackcomb all over the world.

With the Peak2Peak opening in 2008, Whistler-Blackcomb finally broke two world records and is recognized in the Guinness World Record Book 2015 as the highest cable car above ground (436 meters above the valley floor) and the longest unsupported span between two cable car towers (3.024 kilometers). For skiers and boarders it is now easier to access the high alpine terrain on both mountains. But even for sightseers it is redefining the mountain experience in winter and summer by very impressive views and an incredible experience.

Those 50 years of lift history show: Competition drives innovation; but when two former rivals team up, they can move mountains and bring great peaks closer together.

Explore Whistler’s lift history on the map.

For a description of the location numbers in the map see the tables below.
For a description of the location numbers in the map see the tables below.

Map locations 1, 2 & 3: It all started in Creekside

In January 1966, Whistler officially opened to the public with its first lifts, a four-person gondola manufactured by the Swiss company, Mueller Lifts Ltd., to the mid point of the mountain, a double chair lift called Red Chair to the upper tree line, which were both active until 1992, and two T-bars, T-Bar I on the top part and a Valley T-Bar. In 1968, the Valley T- Bar was relocated, and a new T-Bar 2, which still runs alongside T-Bar 1, was installed. Four years later, the two-person Olive chairlift was created alongside the Creekside Gondola, which was replaced in 1992 by the Quicksilver Express Quad Chair. The lift was shut down in 1995 and replaced by the 6-person Creekside Gondola that has been running since. The Redline Express Quad became the new version for the Red Chair and Little Red Chair and was itself replaced by the current Big Red Express in 1997.
In January 1966, Whistler officially opened to the public with its first lifts, a four-person gondola manufactured by the Swiss company, Mueller Lifts Ltd., to the mid point of the mountain, a double chair lift called Red Chair to the upper tree line, which were both active until 1992, and two T-bars, T-Bar I on the top part and a Valley T-Bar. In 1968, the Valley T- Bar was relocated, and a new T-Bar 2, which still runs alongside T-Bar 1, was installed.
Four years later, the two-person Olive chairlift was created alongside the Creekside Gondola, which was replaced in 1992 by the Quicksilver Express Quad Chair. The lift was shut down in 1995 and replaced by the 6-person Creekside Gondola that has been running since.
The Redline Express Quad became the new version for the Red Chair and Little Red Chair and was itself replaced by the current Big Red Express in 1997.

4, 5 & 6: The ancestors of the Emerald Chair

A Blue double Chair lift from today’s bottom of Harmony to the top of Emerald started running in 1966 until its removal in 1995. In 1968, a new double Green Chair 1 was installed and lengthened two years later. Alongside of it a new one, called Green Chair 2 came to live in 1975. Both Green Chairs were replaced by only one quad Chair lift in 1989, which was itself replaced by today’s quad Emerald Express in 1997.
A Blue double Chair lift from today’s bottom of Harmony to the top of Emerald started running in 1966 until its removal in 1995.
In 1968, a new double Green Chair 1 was installed and lengthened two years later. Alongside of it a new one, called Green Chair 2 came to live in 1975. Both Green Chairs were replaced by only one quad Chair lift in 1989, which was itself replaced by today’s quad Emerald Express in 1997.

7 & 8: History of Franz’s Chair

In 1972, a new double Chair lift, Orange Chair, ran from the top of the Creekside Gondola up to the Roundhouse until 2009. In 1978, the Red Chair got a little brother called Little Red Chair on its right side that was a bit shorter. It was removed in 1992, but Franz’s triple chair came up in the same place six years later in 1998.
In 1972, a new double Chair lift, Orange Chair, ran from the top of the Creekside Gondola up to the Roundhouse until 2009. In 1978, the Red Chair got a little brother called Little Red Chair on its right side that was a bit shorter. It was removed in 1992, but Franz’s triple chair came up in the same place six years later in 1998.

9: The Whistler Village Gondola and its early sisters

When Blackcomb Mountain opened in winter 1980, Whistler Mountain directly responded by building the Village Chair as well as developing a whole new network of runs on its northern flank. A 10 Person Village Gondola renewed the Village Chair in 1988. All towers and the complete structure remained in the same location until today, only the cars were replaced in 2014 by new 8 passenger cabins.
When Blackcomb Mountain opened in winter 1980, Whistler Mountain directly responded by building the Village Chair as well as developing a whole new network of runs on its northern flank. A 10 Person Village Gondola renewed the Village Chair in 1988. All towers and the complete structure remained in the same location until today, only the cars were replaced in 2014 by new 8 passenger cabins.

10 & 11: Developing the Olympic Chair

In 1980, Whistler Mountain also built the Olympic Chair and the Black Chair to develop the new network of runs on its northern flank. The Olympic Chair was shortened nine years later where it remains since then. Removed in 1999, the Black Chair covered the area from the top of Olympic Chair up to Roundhouse for 19 years.
In 1980, Whistler Mountain also built the Olympic Chair and the Black Chair to develop the new network of runs on its northern flank. The Olympic Chair was shortened nine years later where it remains since then. Removed in 1999, the Black Chair covered the area from the top of Olympic Chair up to Roundhouse for 19 years.

12: Reaching out to Whistler Peak

One year after Blackcomb had installed its Alpine 7th Heaven T-Bar to become North Americas only “Mile High Mountain”, Whistler Mountain responded with a high alpine triple Chair lift, called Peak Chair. In 1998, one year after the merge of Whistler and Blackcomb, a new quad Peak Express that is still in use today replaced the 12 years old 3-person Peak Chair.
One year after Blackcomb had installed its Alpine 7th Heaven T-Bar to become North Americas only “Mile High Mountain”, Whistler Mountain responded with a high alpine triple Chair lift, called Peak Chair. In 1998, one year after the merge of Whistler and Blackcomb, a new quad Peak Express that is still in use today replaced the 12 years old 3-person Peak Chair.

13, 14, 15 & 16: First chairlifts on Blackcomb

Blackcomb Mountain opened in winter 1980 with 5 chairs, including Fitzsimmons, a triple chair that ran from the Village to Base 2, replaced by today’s Excalibur Gondola in 1994. Skidder was located were the current Tube Park area is. Cruiser, a triple Chair, covered the second section of today’s Excalibur Gondola. Cat Skinner still runs today. Choker was replaced in 1994 by the quad Excelerator Express that is still in use today.
Blackcomb Mountain opened in winter 1980 with 5 chairs, including Fitzsimmons, a triple chair that ran from the Village to Base 2, replaced by today’s Excalibur Gondola in 1994. Skidder was located were the current Tube Park area is. Cruiser, a triple Chair, covered the second section of today’s Excalibur Gondola. Cat Skinner still runs today. Choker was replaced in 1994 by the quad Excelerator Express that is still in use today.

17: History of Jersey Cream

Only two winters after opening the mountain, Blackcomb established Jersey Cream a 2 person chair in 1982. I was replaced by the current quad version in 1989.
Only two winters after opening the mountain, Blackcomb established Jersey Cream a 2 person chair in 1982. I was replaced by the current quad version in 1989.

18: Up to 7th Heaven

When Blackcomb installed its alpine 7th Heaven T-Bar in 1985 it opened up a new area offering immense above tree line skiing including four powder bowls and wide open glacier skiing. To keep up with Whistlers Peak Chair, Blackcomb removed the old 7th Heaven T-Bar and has build a new 7th Heaven Express, a 4 person Chair, running along a complete new and longer lift line, that is still in use today.
When Blackcomb installed its alpine 7th Heaven T-Bar in 1985 it opened up a new area offering immense above tree line skiing including four powder bowls and wide open glacier skiing. To keep up with Whistlers Peak Chair, Blackcomb removed the old 7th Heaven T-Bar and has build a new 7th Heaven Express, a 4 person Chair, running along a complete new and longer lift line, that is still in use today.

19: History of the Magic Chair

In 1987, a skiers learning area for beginners on Blackcomb was accessible by the Magic Chair, which has been replaced by the current triple Chair version in 1994.
In 1987, a skiers learning area for beginners on Blackcomb was accessible by the Magic Chair, which has been replaced by the current triple Chair version in 1994.

20: Opening the Harmony Bowl

With the new Harmony Express quad Chair Whistler Mountain has been offering a new terrain spanning from the edge of the Symphony Amphitheatre all the way over to Glacier Bowl and down to the Peak Express since 1995. This area now known as the Harmony Zone provides a wide variety of beginner to expert terrain. In 2014, a high-speed six person chair lift replaced the quad chair to dramatically improve the uphill capacity by 50 percent. The old quad chairs were re-used to build the Crystal Ridge Express.
With the new Harmony Express quad Chair Whistler Mountain has been offering a new terrain spanning from the edge of the Symphony Amphitheatre all the way over to Glacier Bowl and down to the Peak Express since 1995. This area now known as the Harmony Zone provides a wide variety of beginner to expert terrain. In 2014, a high-speed six person chair lift replaced the quad chair to dramatically improve the uphill capacity by 50 percent. The old quad chairs were re-used to build the Crystal Ridge Express.

21: Preparing the way to the Glacier

Since 1987, skiing on the Horstman glacier, named after Henry Horstman who arrived in the valley in the year 1913, is possible with the same-named T-Bar that is still operating. Additionally, faster mountain access directly from the Blackcomb Base combined with new runs has been provided by the currently running high-speed quad chairs Wizard Express and Solar Coaster Express Chair lifts. Only two years later Blackcomb expanded further by implementing the new triple Crystal Chair lift and the Showcase T-Bar. Both T-Bars, Horstman and Showcase, doubled the summer glacier skiing capacity. Blackcomb came up with the current version of the Glacier quad chair in 1992. In 2013, the quad chairs of the former Harmony Express were re-used to build the Crystal Ridge Express which replaced the old Crystal Chair. The new chair follows a longer lift line which increased the capacity to the Crystal Zone.
Since 1987, skiing on the Horstman glacier, named after Henry Horstman who arrived in the valley in the year 1913, is possible with the same-named T-Bar that is still operating. Additionally, faster mountain access directly from the Blackcomb Base combined with new runs has been provided by the currently running high-speed quad chairs Wizard Express and Solar Coaster Express Chair lifts. Only two years later Blackcomb expanded further by implementing the new triple Crystal Chair lift and the Showcase T-Bar. Both T-Bars, Horstman and Showcase, doubled the summer glacier skiing capacity. Blackcomb came up with the current version of the Glacier quad chair in 1992. In 2013, the quad chairs of the former Harmony Express were re-used to build the Crystal Ridge Express which replaced the old Crystal Chair. The new chair follows a longer lift line which increased the capacity to the Crystal Zone.

Installation of Peak2Peak, Symphony, Fitzsimmons & Garbanzo

Shortly after modernizing the Whistler Peak access, two new quad Chair lifts, the Fitzsimmons Express and the Garbanzo Express, were installed to allow easier access from the Village up to the mid-station respective the Chic Pea Hut. In 2005, a new high-speed quad chairlift, today’s Symphony Express, was added on the Whistler side. It has provided a whole new beginner and intermediate terrain around Symphony Bowl and a closer access to the top of Flute Bowl. The new world class Peak2Peak Gondola opened in 2008. It provides visitors with double mountain access on a peak level. The gondola has the worldwide longest unsupported span (3.024 kilometers). With its 436 meters above the valley floor it is the highest lift of its kind.
Shortly after modernizing the Whistler Peak access, two new quad Chair lifts, the Fitzsimmons Express and the Garbanzo Express, were installed to allow easier access from the Village up to the mid-station respective the Chic Pea Hut.
In 2005, a new high-speed quad chairlift, today’s Symphony Express, was added on the Whistler side. It has provided a whole new beginner and intermediate terrain around Symphony Bowl and a closer access to the top of Flute Bowl.
The new world class Peak2Peak Gondola opened in 2008. It provides visitors with double mountain access on a peak level. The gondola has the worldwide longest unsupported span (3.024 kilometers). With its 436 meters above the valley floor it is the highest lift of its kind.

Many thanks go to Rod Nadeau and Ecosign Mountain Resort Planners Ltd. who helped gather information about Whistler’s lift history.

8 thoughts on “The History of Whistler’s Lifts”

  1. Very informative, but you left off one area and that’s the summer camp lifts on Whistler. There was the Team Canada Rope Two and 2 or 3 Harush handle tows. then by 1975 I believe there was the Harush T-Bar that was built each May and dismantled in Aug. Then with the DMSSC they put in a Platter for a few years before moving to Blackcomb.

  2. This is an awesome description of what the lift were like. I had the pleasure of riding many of these lifts. But from my working on the mountain and years of skiing here, The orange and black didn’t goto the roundhouse. They Both ended at the top of the Dave Murray downhill.

  3. On 7th Heaven the Tbar was replaced by a chair with mid station and I’m pretty sure it was a triple chair. That was then replaced by the Express high speed quad.

    1. It was in fact a high-speed quad that would run at half speed when the hydraulic mid-station tower was lowered before the top had avy clearance for the day. You can see today that 2 tower numbers are missing at that level.

  4. A few edits for ya.
    On Whistler mtn., the orange chair and black chair did not go to the roundhouse. They terminated at the top of Dave Murray DH.
    On Blackcomb, the original Jersey Cream chair (known in the early 80s as “chair 6”) was a triple chair, not a double. No lifts on Blackcomb from 1980 – 86 had names. They were all just numbered.
    Horstman Glacier was named after Harry Horstman (not Henry).
    Maybe check with Hugh Smythe next time? He’d be a good resource 😉

  5. The wizard chairlift in Blackcomb was great. I was at the press release of the wizard chairlift and at the season pass holders presentation. As well I was at the grand opening event where Grace McCarthy Minister of tourism presided over the ceremony..

    I was there because I was the hired magician (wizard) onstage and at the opening.

    Great memories from 35 years ago

    Tim

Leave a Reply