Tag: Franz Wilhelmsen

This Week in Photos: February 15This Week in Photos: February 15

0 Comments

These photos from the Whistler Question show a much smaller Whistler, where everything from a visit by the Governor General, to a snowblower surviving an encounter with a train, to a visiting Rotary exchange student, to a mysterious explosion in a Longhorn toilet are recorded together in the paper.

1979

Whistler as it should be – Doug Read gets into it on “Upper Insanity” on Friday.
An RCMP under-ice diving training school was held on Alta Lake during the past week. Scott Alpen photo.
A view of the Whistler Vale complex with the old Cheakamus Inn in front and the new units to the left and behind.

1980

Squaw Valley Crescent takes some of the overflow parking from Lake Placid Road.
Bob Matheson works on the new Superior Muffler pipe bending machine.
Sunshine and good skiing – the way it has been on the top of Whistler for the past week.
CKVU’s Ralph (Raccoon) Carney interviews Tom Jarvis, Beau Jarvis and Peaches Grant at Beau’s on Sunday evening.
Nicholas Busdon heads across the finish line in the Elementary Boys race.

1981

Chef/owner of the Black Bear Geoffrey Howes and Patty Harvey at work in the kitchen.
The vehicle Steve Podborski was driving and the Toyota driven by Kathy Rollo after the February 14 accident.
Rotarian Frank Satre and Whistler’s exchange student, Teresa Delgado from Chihuahua, Mexico.
Franz and Annette Wilhelmsen (front) and Debbie and Hugh Smythe (rear) enjoy dinner at the opening of Stoney’s restaurant last week.

1982

With the reddest of heart and the fleetest of foot, a be-winged Cindy Woods turned into cupid for a day (guess which one) to deliver flowers throughout the valley for Valley Vines & Petals.
All bagged up and ready to go – Sue Spurrell, Dave Barnes and Leslie Christmas, all from Newfoundland, try out the x-country skiing at Whistler Village wearing Blackcomb bags for protection.
Kermit joins the happy gang at Stoney’s who celebrated their first birthday Monday, February 15. Ball team members are (l to r) Bruce Fox, manager; Jack Cram and Lance Fletched who co-own the restaurant with Dick Gibbons; and Fetah Benali, chef.
Fire in Alpine! It was nearly one month to the day since fire raged through the Whistler Village Inn, when Whistler’s Volunteer Fire Depart. was called out to a blazing cabin in Alpine Meadows. The fire fighters subdued the blaze at 8340 Needles Drive in about 35 minutes.
Testimony to the durability of the Toro snowblower. One wheel points to the sky but the machine is still in one piece after being struck and dragged 200 metres by a BCR train.

1983

The Japanese version of Johnny Carson was being filmed at Blackcomb Mountain Monday, February 14. Akiko Kobayashi, a TV personality, and Sachiko Sakulay, an actress, are on Willie Whistler’s right and Miss Ski Japan Yukali Yamada and host Tommy Yakota stand on his left.
Shovelling snow outside the Hearthstone Lodge (before the advent of heated steps).
Let’s get Springfit! Adult Education classes in fitness continue with instructors (l to r) Debi Mitchell, Jan Alsop and Shelley Cerasaro. These ladies will take you through a vigorous program of warm-ups, aerobic workouts, calisthenics and stretching.
Canada’s Governor General Ed Schreyer (second from right) hit the slopes of Whistler Mountain Tuesday. Both he and Mrs. Schreyer received some tips from Bob Dufour and Dave Murray while enjoying their five-day vacation.
A sound “like someone dropping a huge sheet of metal” turned out to be an explosion which destroyed cubicle number three in the women’s washroom of the Longhorn Pub Thursday, February 10. A similar explosive device was used to blow up a garbage can in the Longhorn Saturday, February 12 and a 31-year-old New Westminster man, Clifford Michael Balkwill, has been charged with use of a dangerous explosive in connection with the second incident. The explosives, known as “fish salutes”, are manufactured for anglers to scare seals away from their prey.

1985

Firemen and residents were able to rescue some possessions from burning condos at Alpine Village Saturday, but losses were heavy and by the next day insurance investigators were already on the scene.
Whistler Mountain celebrated 20 years with some familiar faces (as well as cake, clowns and more).
Whistler Mountain created a new sport Saturday: Gondola stuffing!
The kids’ team stuffed the most bodies into the gondola with 27, while the counterweights (a minimum of 200 lbs each) could only manage nine.
Mike Davidson of the Alta Lake Sports Club will even spend time in the brig if it means hanging onto his hobby cannons. The one-pounder above was made by Great West Cannon Co. of Granville Island and is authentic in size and workmanship to the original, Davidson says. It was often hoisted into a ship’s rigging and used to fire nails and other shrapnel at the enemy. Davidson uses the cannon to proclaim open the various sporting events but two years ago found himself in RCMP lock-up for four hours when a policeman arrested him for discharging a firearm in the municipality. But it’s all in good fun, and the only thing fired is paper.

The Early Days of CreeksideThe Early Days of Creekside

5 Comments

The community of Alta Lake, which attracted visitors and families with cabins in the summer for hiking, hunting and fishing along the lakefront, was forever changed in 1960.

That year, the Garibaldi Olympic Development Agency, led by Franz Wilhelmsen, chose the valley as the site to bring the 1968 Winter Olympics to Canada and British Columbia.  The failure of this first Olympic bid, while discouraging, did not dissuade the group from deciding to build a world-class ski resort.

A very optimistic sign at the base of Whistler Mountain. Photo: Whistler Mountain Collection

The Garibladi Lift Company installed the first gondola-accessed ski area in North America and opened the ski resort in January 1966.

With the ski resort in operation, the newly formed Chamber of Commerce operated as the local government overseeing the sporadic development surrounding the gondola base. The Garibaldi Lift Company did not have the financial resources to purchase the property around the gondola base allowing others to purchase the land.

With the lack of an official community plan or recognized local government, development went unchecked.  Ski cabins were scattered around the base along with a gas station/grocery store and a telephone exchange.  The Garibaldi Lift Company built an interdenominational skier’s chapel, complete with bells and a memorial stain glass window.

The Cheakamus Inn, the Highland Lodge, Rainbow Lodge and other Alta Lake lodges housed visitors in what had normally been the off-season for the Alta Lake community.  A large development was planned near the shores of Nita and Alpha Lakes.  The development would have included residential and commercial properties as well as more recreational areas such as a curling/skating rink, swimming pool and tennis courts.  A condominium development called Alpine Village sat above the gondola area on the slopes of Whistler Mountain.  The UBC Varsity Outdoor Club began constructing their new club cabin near the gondola base.

Alpine 68 newly constructed in 1968. Condos such as these sprung up around Creekside and Nordic.  Photo: Whistler Mountain Collection

The popularity of skiing also brought long waits to ride the gondola up to the mid-station.  The wait times would sometimes exceed three hours just to get on the gondola, prompting the Garibaldi Lift Company to offer free skiing to those willing to hike to the mid-station.

The parking lots at the base of the gondola were consistently full.  Highway 99 was finally blacktopped between Squamish and Whistler, but the drive was still full of hairpin turns and single lane bridges.  This didn’t stop skiers from driving up from the city.

A full (and colourful) parking lot in Creekside. Photo: Whistler Mountain Collection

The popularity of the ski resort also attracted another group of people to the valley: “hippies” and those involved in the counterculture movement.  Those unable to afford to purchase land or build their own ski cabin would squat on Crown land.

With the RMOW established on September 6, 1975 the chaotic nature of development in Whistler’s early years was over the focus on bringing about the well-planned Whistler Village began.

Gerhard Mueller: Designer of Whistler’s First LiftsGerhard Mueller: Designer of Whistler’s First Lifts

0 Comments

With the wet weather, frigid temperatures and winds that have come in the last two months, many of us out on the mountains have appreciated the temporary respite offered by the enclosed gondolas.  To show our appreciation, we’re offering some information on the man who designed the first lifts installed on Whistler Mountain, including the original four-person gondola.

Skiers load the original four-person gondola at the base of Whistler Mountain in the late 1960s.
Skiers load the original gondola at the base of Whistler Mountain in the late 1960s.

Gerhard Mueller was an early pioneer in the ski lift industry.  In the late 1920s, as mountain resorts in the Alps were still beginning to redefine themselves as winter resorts, Mueller was a 17-year-old mechanical engineering student who had grown tired of having to continuously climb up the slope in order to practice his skiing on the way down.

To address this issue Mueller built his (and Switzerland’s) first ski tow at St. Moritz using 1″ hemp rope and the engine from an old motorcycle.  This first rope tow was patented in 1932 and was later improved to address complaints of tired hands and arms.

After the end of World War II Mueller founded his own company, GMD Mueller, in 1947 and continued to design innovative lift systems, including the modern detachable chairlift.

A page from a 1965 GMD Mueller catalogue. Photo: chairlift.org/mueller.html
A page from a 1965 GMD Mueller catalogue. Photo: chairlift.org/mueller.html

In their 1965 catalogue GMD Mueller advertised their ski lift options, claiming that “The roomy 4-seater gondolas, the elegant double-chairs or the smooth springbox-type T-bars will make every ride, both short or long, comfortable and safe, and the good appearance of Mueller Lifts will make you a proud owner.”  In less than two decades they had come a long way from Mueller’s first rope tow.

In the early 1960s when Franz Wilhelmsen and Eric Beardmore, another Garibaldi Lift Ltd. director, visited Europe to study lift systems prior to choosing the systems to be used at Whistler, many chairlifts still had to be stopped both to load and to unload passengers.  The double chairlift designed by Mueller had patented detachable cable grips that detached the chairgrip from the hauling rope at both stations, allowing the hauling rope to continue to run while the chair was slowed for loading and unloading before being reattached to the hauling rope and launched.  This allowed for the creation of a four-person gondola.

When approached, Mueller confirmed that his designs could be adapted to fit the proposed locations on Whistler Mountain.  For the lower stage from the base at Creekside to Midstation, where warmer spring temperatures and wet weather prompted worries of wet clothing before skiers even reached their first run, Mueller proposed a 65-car four-person gondola carrying approximately 500 passengers per hour for a 13-minute ride.  This was to be followed by a double chairlift of 175 chairs carrying approximately 1200 passengers per hour.

The original Red Chair brought riders up to the Roundhouse from 1965 to 1992.
The original Red Chair brought riders up to the Roundhouse from 1965 to 1992.

In 1965 four Mueller-designed ski lifts were installed on Whistler Mountain: the four-person gondola, the double chairlift that would become known as the Red Chair and two T-bars.  Mueller travelled to Whistler to oversee the construction and testing of the lifts and to conduct training sessions with lift staff.  GLC workers were also sent to Switzerland to be trained on the operation and maintenance of the lifts at the GMD Mueller factory.  Mueller was present for for the official opening of the lifts on January 15, 1966.

chair1.jpg
A seat from the original Red Chair sits in Florence Petersen Park.

Whistler Mountain was equipped exclusively with Mueller lifts for only two years.  In 1966/67 the Blue Chair was designed and installed by Murray-Latta Machine Co. Ltd., a Vancouver-based company.  The original gondola and Red Chair were retired in 1992, but both can still be found here at the museum, a lasting legacy of the designs of Gerhard Mueller.

The Lone BagelThe Lone Bagel

0 Comments

The Eighties are often remembered, fairly or unfairly, for questionable fashion and pop culture aesthetics, but here in Whistler it was a transformative era that saw the resort reach brand new heights. One of the key figures in Whistler’s rise during this period is Lorne Borgal, and we were lucky enough to have him participate in our recent Speaker Series soiree, plus he recorded an oral history interview with us, which help us outline some of his many contributions to Whistler.

retro.jpg

Lorne arrived in Whistler in June 1980 with a fresh MBA from Stanford University, driving up from California within days of graduating. He had been hired by Hugh Smythe to help manage a nascent Blackcomb Mountain. As he recalls, “from accounting, marketing, sales, to any of the operating entities, ski patrol, lift operations or anything to be ready for opening day, on the operating side fell to me.” Needless to say, the days were long and the learning curve was steep.

All the business school in the world couldn’t have prepared him for having to wire the telephone lines himself when BC-Tel was on strike, or having to play traffic cop to help skiers get home to Vancouver after a busy day on the slopes. As is the case with so many of our resort’s leaders over the years, Lorne had an ingrained determination to get the job done by whatever means necessary.

As the following audio clip demonstrates, recorded during our December 2015 Speaker Series event, there was no shortage of challenges during Blackcomb Mountain’s early days:

After three seasons Lorne was ready to move on, but fate had other plans. While on vacation in Europe (his first vacation in three years), he received a phone call from Whistler Mountain marketing executive Mike Hurst (who, coincidentally, sat beside Lorne at the Speaker Series), informing Lorne that Franz Wilhelmsen was retiring and Lorne was being considered as his replacement as Whistler Mountain President. Lorne happily accepted the new job, but not before completing his Mediterranean tour.

Here he is at the the December 10,1983 ceremony dedicating the newly named Franz’s Run in honour of outgoing President Franz Wilhelmsen.

bagpipe.jpg

For the next six years Lorne oversaw the mountain during a period of intense competition with the upstart Blackcomb. He was at the helm of major projects such as the construction of Pika’s Restaurant – Whistler’s first proper on-mountain eatery, the visionary installatios of the original Peak Chair and the Village Gondola, leading international trade missions to expand the resort’s global reach, and updating Whistler Mountain’s management and customer service to keep up with a rapidly changing world.

Since leaving Whistler Mountain Lorne has served as an executive for a global software company, President of two other resorts, and continues to consult globally for upstart ski resorts around the world. His contributions to Whistler are most notably recognized up in the Whistler alpine, where Bagel Bowl refers to a playful nickname of his, “the Lone Bagel.”